Extension calculator
What an extension or a loft costs, and what the finished house has to be worth
Choose the job, the size and where it is, then set each professional fee and the contingency to whatever you have been quoted. We publish no percentage for value added, deliberately: every figure in circulation traces back to an agent's press release rather than to what houses actually sold for. So the tool asks what you think it would be worth finished and tells you what it has to reach to pay for itself, at both ends of the cost range.
For: More space on a building you already own
Fees on top of the build
What it is worth
Where these figures come from
Build costs. Published UK guides at 2026 prices, including VAT and labour: single storey extension £2,000 to £3,000 a square metre, two storey £1,600 to £2,500, garage conversion £900 to £1,500. Loft conversions: rooflight £20,000 to £40,000, dormer £40,000 to £70,000, mansard £55,000 to £95,000. Basements £2,500 to £4,200 a square metre.
Region and specification. Rates are quoted at West Midlands prices. London runs 30% to 45% higher and the South East 20% to 25%. Level of finish moves the price further than size does.
Fees. Householder planning application £548 from 1 April 2026, plus a £91 Planning Portal charge. A lawful development certificate is £274. Building control £700 to £1,300 on an extension up to 40 square metres. Structural engineer £1,500 to £2,500. Party wall £1,500 to £3,000 per neighbour. Architect 3% to 7% of construction cost.
Value added. Deliberately not published here. We could find no figure in circulation that traced back to transaction evidence rather than to a press release, so the finished value is yours to set and ours to sense-check on the phone.
Published UK build costs as at September 2026, including VAT and labour, and every figure adjustable. An extension, a loft or a refurbishment of a home somebody lives in is standard rated for VAT with no relief at any scale; the reliefs apply to new dwellings and to conversions that change the number of dwellings, which is a separate calculator. Permitted development allowances differ by house type and are removed entirely in conservation areas, in National Parks, on listed buildings, under an Article 4 direction, and on flats. Party wall notices need two months before work can start. An estimate, not advice, and not a quotation: nobody here puts a firm figure on a building before they have stood in it.