Room by room estimator

Price a refurbishment, an extension or a conversion, one space at a time

Most cost calculators open on a six figure number for a job nobody asked for, because they price a whole building against an average. This one starts at nothing. Add a room, a garden, a loft or a roof, give it a size or keep the typical one, and tick the work you actually want doing in it. Every rate is measured against that space's own dimensions, and the total is the sum of what you chose and nothing else. Renovating, extending and converting all sit in the same estimate, because most real jobs are two of the three.

For: Anything from a single room to a whole house, extended or converted

The jobThree questions and the size of the crew, then build the job up space by space. Nothing here costs anything on its own.
Where is it?
Every rate here is a North West price, so nothing is added or taken off for where it is.
What standard of finish?
What a private buyer expects in a family house. Every rate here is quoted at this.
How old is the building?
Cavity walls, and wiring that has usually been touched once.
People on the job. It turns the days of work into weeks, five days a week: two people get through a ten-day room in a week.
Your spacesThis is the whole calculator. Add a room, an outside area, or a part of the building, put work in it, and watch the figure on the right build up from nothing.
What else to allow fornothing added
All of this is off. None of it is added to the figure on the right until you move it, and every one of them is a real cost on a real job.
%
Ten per cent on anything with age in it, twenty or more on a derelict building. This is the money for what is behind the plaster, and on an old house it is the line most likely to be spent in full.
%
Eight to twelve per cent to programme it, procure it, run the site and check every valuation before you pay it. Stated here rather than buried in the rates, so you can see exactly what you would be paying us and argue with it.
12-month warranty on the work
A year's cover on what is built: anything that fails in that time is put right at no charge. 10% of the works and our fee together, as its own line, so you can see what it costs to have.
Which VAT rate applies?
Work to a home somebody lives in, whatever its scale.
Show the total with VAT in it?
The figure stays the price of the building work. The VAT is shown beside it.
Nothing added yet£0Add a room, a garden or a roof below, and it starts counting. Only what you tick is priced, so a cloakroom costs what a cloakroom costs.
How this works
Add a space. Give it a size, or keep the typical one. Tick the work you want doing in it. The figure above is the sum of exactly that and nothing else — no preset job, no assumed building, and nothing added on top that you did not ask for.
It handles three jobs at once
Renovating what is there, extending onto it, and converting it into something else. Each space carries its own answer to that, so a house with a new kitchen, a loft conversion and a re-roof is one estimate rather than three.
Where these figures come from

What the rates are. What a builder charges a customer for that item, fitted, excluding VAT, at a good domestic standard in the North West, which is where we work and the region every rate is quoted at. They already include labour, materials, the builder's overhead and the builder's margin, so nothing is added on top of them for those. Published UK cost guides at 2026 prices, cross-checked against what our own trades charge.

Labour and materials. A space priced as labour plus materials uses each work's labour-only rate, the same North West prices with the materials taken out, and lists the materials it takes at merchant prices per item, supply only, excluding VAT. A quantity is the space's measurement times a coverage rule — sixty bricks to a square metre of wall, a bag of plaster to ten — plus 10% wastage (10% unless you change it) for the cuts and the breakages, rounded up to whole units and to whole packs where it comes in one. Tick the materials off, or type the quantity you have counted, and the space uses yours.

How quantities are worked out. Floor and ceiling are length × width. The perimeter is twice length plus width. Wall area is the perimeter times the height, less 10% for the doors and windows in it. Anything priced one at a time asks you for the number.

The programme. Every work carries the hours a unit of it takes. A space's hours are added up and shown as eight-hour days; weeks are days divided by the crew times five. It is the labour on the space, one space after another, and not a promise about the order or the drying times.

What moves a rate. Three things only: where it is, the standard of finish, and the age of the building — and age only touches work on what is already standing. A material is not moved by any of them: a brick costs what the merchant charges. Listed buildings, restricted access and working round people who live there are all real costs, and they are priced as their own lines where they apply rather than as a silent percentage on everything.

Benchmarks to check the answer against. A bathroom refitted £5,500 to £11,000. A kitchen fitted £8,000 to £22,000. A full house refurbishment £900 to £1,800 a square metre. A single storey extension £2,000 to £3,000 a square metre all in, a two storey £1,600 to £2,500. A loft conversion £27,500 for a rooflight scheme, £40,000 to £70,000 for a dormer. A garage conversion £900 to £1,500 a square metre. New build £1,900 to £3,200.

VAT. A new dwelling is zero rated. A conversion that changes the number of dwellings, and a home empty for two years or more, are both at 5%. Everything else is standard rated. The contractor has to charge the right rate at the time with the evidence on file; it is not something reclaimed afterwards.

An estimate, and a desktop one: published rates measured against sizes typed into a form. It is a genuinely useful starting point and it is not a quotation, a tender or a valuation, and nobody here will put a firm figure on a building before they have stood in it. The rates exclude what nobody can see from a description — what is under the floor, what the drains are made of, what the last contractor did badly and what the ground is like. That is what the contingency is for. Where a survey follows, what comes back is a priced, tender ready schedule against these same lines rather than a condition report, and the fee for it comes off the build if you appoint us.